Customers
/
Case studies

Ensure On-Time Drug Shipments: How to Quickly Replace Your Serialization System with the Leading Track-and-Trace Platform

Learn how to quickly replace your serialization system with Vimachem's leading track-and-trace platform to ensure on-time drug shipments.

3 months
Full L3 to L5 replacement
Zero
Production downtime during cutover
In 2019, Help Pharmaceuticals implemented a new serialization solution from another provider to comply with the EU Falsified Medicines Directive. However, the solution’s closed architecture required complex and difficult-to-manage interfaces which complicated the process of onboarding new packaging lines and trading partners.
In 2022, Help Pharmaceuticals remedied the situation by migrating to a joint solution from Vimachem and Tracelink. The Vimachem Pharma 4.0 platform enabled Help Pharmaceuticals to implement a best-of-breed serialization solution from Seidenader / Optel (L1-2) , Vimachem (L3) and Tracelink (L4-5) while taking advantage of additional Vimachem Pharma 4.0 applications like Manufacturing Digitization and OEE.

Watch this quick highlight video from a recent Vimachem and Tracelink webinar to learn how Help Pharmaceuticals was able to rapidly implement this future-proof serialization solution with no production downtime in less than 3 months.

giannis-fotopoulos

Giannis Fotopoulos

QA Manager/Serialization Project Lead, Help Pharmaceuticals

alex-vidras

Alex Vidras

Executive Director, Vimachem

benoit-eymard

Benoit Eymard

Vice President EMEA Sales, TraceLink

Ensure On-Time Drug Shipments: How to Quickly Replace Your Serialization System with the Leading Track-and-Trace Platform
Click to enlarge

Fill out the form to see the full webinar

Thank you. A member of the Vimachem Account Management team will email you the case study.
Oops! Something went wrong while submitting the form.

Ready to augment your shop floor operations?

Request a demo